Название: Overall Equipment Effectiveness
Автор: Robert Hansen C.
Издательство: Ingram
Жанр: Здоровье
isbn: 9780831191153
isbn:
2.2Data Collection Review
2.3Practice Production Report
2.4Summarization Example
Method 1 OEE Using Nakajima Formulas
Method 2 OEE Using Event Time Records
Method 3 OEE Based On Good Units Transferred
2.6Reconciliation and Loss Analysis
3.The Financial Aspects of OEE
3.1Factory Example: Base Case
3.2Case B: Same Output, Improved OEE
3.3Case C: Full Factory, Improved OEE
3.4Case D: OEE Impact on Return On Assets (ROA)
3.5Case E: Higher OEE with the Same Sales, ROA
3.6Case F: Higher OEE, Selling Everything Produced, ROA
4.The People Factor
4.1The Most Important Resource: Actively Learning, Motivated People
4.2Group Centering Exercise
The Metronome Exercise
4.3Skills, Interaction, Action
4.4Observation and Education
4.5Work Group Experiences
4.6An Example of Expectations: Master Mechanics
4.7An Example of Expectations: Technicians
4.8Interviewing and Hiring
4.9Ranking and Compensating
5.Priority and Decision Tools
5.1The Value Fulcrum
5.2Developing a Troubleshooting Guideline Decision Tree
6.Win-Win Maintenance/Equipment Shutdown Strategies
6.1Steps to Improve TEEP: A Case Study
Identify
Exploit
Subordinate
Elevate
Go back
6.2Shutdown Strategy Checklist
7.Reliability 101
7.1Reliability101 Introduction
7.2Reliability Nomenclature
7.3Beginning Reliability with What You Have
7.4Matching Maintenance Strategy to Equipment Function
7.5Developing Best Practices
7.6Building Reliability into Equipment Design
8.Reliability Availability Maintainability/System Performance Analysis, (RAM/SPA)
8.1RAM/SPA
8.2Improving the ‘Horse’ you Already Have / Starting Reliability
8.3Quick Changeovers: Single-Minute Exchange of Dies
8.4Theory Of Constraints
8.5Data collection and Information sharing
8.6Pareto Analysis
8.7Project Management and Asset Life Cycle
8.8Speed ups
8.9Cycle time improvements
8.10Benchmarking
9.A General Tool for Acceptance Testing
9.1Reliability Quantification Testing
9.2Implementation Stories
Case 1. Barrel Dumper Project
Case 2. Computer System Upgrade
Case 3. Material Handling Wheels
Case 4. Automatic Core Loading
10.Success or Failure
10.1The Success Riddle
10.2Why Factories Fail
Impending Failure Study
APPENDIX
1.Recommended Reading
2.RAPTOR
3.Redundancy Equations
4.Generic Failure Rates
5.Mechanical Failure Modes
6.Failure Mode Effects and Criticality Analysis
7.Constructing Pareto Charts
8.Preserving Failure Data
INDEX
UNDERSTANDING THE POWER OF OVERALL EQUIPMENT EFFECTIVENESS (OEE)
This book is the culmination of the many years of experience I have inside a large Fortune 100 company. It is offered as a “how to improve” guide for many of the issues that exist in manufacturing work centers (factories or refineries) of all sizes and types. We will look at the key parameters for the success of manufacturing communities, then link those parameters to the financial business metrics that are vital to your company’s success. We will also look at the practical application of theories that are commonly spoken, but seldom accepted on the factory shop floor.
Aspects of this book are appropriate for everyone involved in or supporting a manufacturing process. The book provides all work centers СКАЧАТЬ