Arc Flash Hazard Analysis and Mitigation. J. C. Das
Чтение книги онлайн.

Читать онлайн книгу Arc Flash Hazard Analysis and Mitigation - J. C. Das страница 28

Название: Arc Flash Hazard Analysis and Mitigation

Автор: J. C. Das

Издательство: John Wiley & Sons Limited

Жанр: Техническая литература

Серия:

isbn: 9781119709794

isbn:

СКАЧАТЬ 1.10. These arcing times are 0.5 second for 800-A LVPCB and 0.017 second for the 400-A MCCB.

images
Breaker Bolted Fault (kA) Arcing Fault (kA) Trip Time (sec) Opening Time (sec) Arc Time (sec) Ground Gap (mm) Working Distance (in) Arc Flash Boundary (in) Incident Energy Cal/cm2 PPE
800-A 36.8 19.95 0.5 0 No 32 610 198 27 4
800-A LVPCB 36.8 19.95 0.5 0 No Yes 32 32 610 610 198 166 27 21 4 3
400-A 36.8 19.95 0.017 0 No 25 455 21 1.5 1
MCCB Yes 25 455 18 1.2 0
(MCC)

      Electrical arc flash hazard cannot be reduced to HRC zero even in small distribution systems. Electrical power systems vary in complexity—an industrial power system may have a number of in-plant generators in cogeneration mode with utility tie and consume 200 MW of power with hundreds of unit substations and extensive power distribution at medium voltages and low voltage levels, containing motors of thousands of horsepower, a single motor exceeding ratings of 25,000 hp or more and multiple utility interconnections. Conversely, a system with a one or two 480 V transformers of 1000 KVA will also be classified as industrial systems. Thus, it is difficult to lay down all the general rules for reducing arc flash hazard in power systems.

      This book contains many study cases and examples, and it is recommended that a reader may do a first reading of the book to grasp an overall picture, followed by a subsequent study. The following common parameters can be stated for arc flash hazard reduction:

      1 Reduce the short-circuit currents by proper system designs and load distribution. The arcing current is a function of the bolted three-phase current, and its reduction in the first place will reduce the arc flash hazard (see Chapters 5 and 6).

      2 Manipulate the protection and protective device coordination without sacrificing selectivity. Generally, it can be said that reducing the short-circuit currents in an existing system will be practically impossible, but the protective relaying can be manipulated to reduce the arcing time. See Chapters 7 through 14, which discuss differential protections, arc flash detection protection, zone selective interlocking, use of maintenance mode switches to alter the protective relay settings, application of modern multifunction microprocessor-based protective relays, and coordination on instantaneous basis with current limiting devices.

      3 Consider high resistance grounding systems—though the IEEE equations give a lower incident energy for solidly grounded systems, as compared with resistance grounded or high resistance grounded systems; because it takes a safe stance that single line-to-ground faults will quickly escalate to three-phase faults; yet approximately 70% of the faults start as single line-to-ground faults. The single line-to-ground faults in solidly grounded systems can be even higher than the three-phase faults. See Chapter 4.

      The IEEE Guide equations reveal that the incident energy and the resulting arc flash hazard for a certain equipment type depends only upon these three parameters as stated above. Yet there are many aspects to be considered for a workers safety, discussed above and in the chapters to follow:

       Remote operation, avoiding human machine interface to avoid human errors during routine operation

       Remote racking of circuit breakers

       Proper system designs and maintenance. See 10 bulleted items describing design features and maintenance in Chapter 2.

       Proper worker training and documentation of safety procedures, and safety awareness

       Proper testing, online monitoring, and diagnostics of the systems

       Proper record keeping

       Applications СКАЧАТЬ