СКАЧАТЬ of Tampa Town. The movement and activity which reigned in the little town that had thus doubled its population in a single day may be imagined. In fact, Tampa Town was enormously benefited by this enterprise of the Gun Club, not by the number of workmen who were immediately drafted to Stony Hill, but by the influx of curious idlers who converged by degrees from all points of the globe towards the Floridian peninsula.

      During the first few days they were occupied in unloading the flotilla of the tools, machines, provisions, and a large number of plate iron houses made in pieces separately pieced and numbered. At the same time Barbicane laid the first sleepers of a railway fifteen miles long that was destined to unite Stony Hill and Tampa Town.

      It is known how American railways are constructed, with capricious bends, bold slopes, steep hills, and deep valleys. They do not cost much and are not much in their way, only their trains run off or jump off as they please. The railway from Tampa Town to Stony Hill was but a trifle, and wanted neither much time nor much money for its construction.

      Barbicane was the soul of this army of workmen who had come at his call. He animated them, communicated to them his ardour, enthusiasm, and conviction. He was everywhere at once, as if endowed with the gift of ubiquity, and always followed by J.T. Maston, his bluebottle fly. His practical mind invented a thousand things. With him there were no obstacles, difficulties, or embarrassment. He was as good a miner, mason, and mechanic as he was an artilleryman, having an answer to every question, and a solution to every problem. He corresponded actively with the Gun Club and the Goldspring Manufactory, and day and night the Tampico kept her steam up awaiting his orders in Hillisboro harbour.

      Barbicane, on the 1st of November, left Tampa Town with a detachment of workmen, and the very next day a small town of workmen’s houses rose round Stony Hill. They surrounded it with palisades, and from its movement and ardour it might soon have been taken for one of the great cities of the Union. Life was regulated at once and work began in perfect order.

      Careful boring had established the nature of the ground, and digging was begun on November 4th. That day Barbicane called his foremen together and said to them—

      “You all know, my friends, why I have called you together in this part of Florida. We want to cast a cannon nine feet in diameter, six feet thick, and with a stone revetment nineteen and a half feet thick; we therefore want a well 60 feet wide and 900 feet deep. This large work must be terminated in nine months. You have, therefore, 2,543,400 cubic feet of soil to dig out in 255 days—that is to say, 10,000 cubic feet a day. That would offer no difficulty if you had plenty of elbow-room, but as you will only have a limited space it will be more trouble. Nevertheless as the work must be done it will be done, and I depend upon your courage as much as upon your skill.”

      At 8 a.m. the first spadeful was dug out of the Floridian soil, and from that moment this useful tool did not stop idle a moment in the hands of the miner. The gangs relieved each other every three hours.

      Besides, although the work was colossal it did not exceed the limit of human capability. Far from that. How many works of much greater difficulty, and in which the elements had to be more directly contended against, had been brought to a successful termination! Suffice it to mention the well of Father Joseph, made near Cairo by the Sultan Saladin at an epoch when machines had not yet appeared to increase the strength of man a hundredfold, and which goes down to the level of the Nile itself at a depth of 300 feet! And that other well dug at Coblentz by the Margrave Jean of Baden, 600 feet deep! All that was needed was a triple depth and a double width, which made the boring easier. There was not one foreman or workman who doubted about the success of the operation.

      An important decision taken by Murchison and approved of by Barbicane accelerated the work. An article in the contract decided that the Columbiad should be hooped with wrought-iron—a useless precaution, for the cannon could evidently do without hoops. This clause was therefore given up. Hence a great economy of time, for they could then employ the new system of boring now used for digging wells, by which the masonry is done at the same time as the boring. Thanks to this very simple operation they were not obliged to prop up the ground; the wall kept it up and went down by its own weight.

      This manoeuvre was only to begin when the spade should have reached the solid part of the ground.

      On the 4th of November fifty workmen began to dig in the very centre of the inclosure surrounded by palisades—that is to say, the top of Stony Hill—a circular hole sixty feet wide.

      The spade first turned up a sort of black soil six inches deep, which it soon carried away. To this soil succeeded two feet of fine sand, which was carefully taken out, as it was to be used for the casting.

      After this sand white clay appeared, similar to English chalk, and which was four feet thick.

      Then the pickaxes rang upon the hard layer, a species of rock formed by very dry petrified shells. At that point the hole was six and a half feet deep, and the masonry was begun.

      At the bottom of that excavation they made an oak wheel, a sort of circle strongly bolted and of enormous strength; in its centre a hole was pierced the size of the exterior diameter of the Columbiad. It was upon this wheel that the foundations of the masonry were placed, the hydraulic cement of which joined the stones solidly together. After the workmen had bricked up the space from the circumference to the centre, they found themselves inclosed in a well twentyone feet wide.

      When this work was ended the miners began again with spade and pickaxe, and set upon the rock under the wheel itself, taking care to support it on extremely strong tressels; every time the hole was two feet deeper they took away the tressels; the wheel gradually sank, taking with it its circle of masonry, at the upper layer of which the masons worked incessantly, taking care to make vent-holes for the escape of gas during the operation of casting.

      This kind of work required great skill and constant attention on the part of the workmen; more than one digging under the wheel was dangerous, and some were even mortally wounded by the splinters of stone; but their energy did not slacken for a moment by day nor night; by day, when the sun’s rays sent the thermometer up to 99° on the calcined planes; by night, under the white waves of electric light, the noise of the pickaxe on the rock, the blasting and the machines, together with the wreaths of smoke scattered through the air, traced a circle of terror round Stony Hill, which the herds of buffaloes and the detachments of Seminoles never dared to pass.

      In the meantime the work regularly advanced; steam-cranes speeded the carrying away of the rubbish; of unexpected obstacles there were none; all the difficulties had been foreseen and guarded against.

      When the first month had gone by the well had attained the depth assigned for the time—i.e., 112 feet. In December this depth was doubled, and tripled in January. During February the workmen had to contend against a sheet of water which sprang from the ground. They were obliged to employ powerful pumps and apparatus of compressed air to drain it off, so as to close up the orifice from which it issued, just as leaks are caulked on board ship. At last they got the better of these unwelcome springs, only in consequence of the loosening of the soil the wheel partially gave way, and there was a landslip. The frightful force of this bricked circle, more than 400 feet high, may be imagined! This accident cost the life of several workmen. Three weeks had to be taken up in propping the stone revetment and making the wheel solid again. But, thanks to the skill of the engineer and the power of the machines, it was all set right, and the boring continued.

      No fresh incident henceforth stopped the progress of the work, and on the 10th of June, twenty days before the expiration of the delay fixed by Barbicane, the well, quite bricked round, had reached the depth of 900 feet. At the bottom the masonry rested upon a massive block, thirty feet thick, whilst at the top it was on a level with the soil.